Sign In | Join Free | My burrillandco.com |
|
Ask Lasest Price | |
Brand Name : | SFC |
Model Number : | XK-160 |
Certification : | ISO, CE, SGS |
Price : | US$6,000-20,000 |
Payment Terms : | T/T, L/C |
Supply Ability : | 50 SETS/MONTH |
Delivery Time : | 25 DAYS |
Automatic New Lab Rubber Plastic Mixing Mill, Open Rubber Mixing Mill
Technical Parameters:
Model | Roller(DxL)(mm) | Front Roller Linear Speed(m/min) | Friction Ratio | Motor Power (KW) | Overall Dimension (LxWxH)(mm) |
XK-150 | φ150x320 | 8.38 | 1:1.21 | 5.5 | 1500x750x1500 |
XK-230 | φ230x600 | 10.21 | 1:1.19 | 15 | 2800x1200x1120 |
XK-250 | φ250x620 | 14.1 | 1:1.17 | 18.5 | 3400x1500x1650 |
XK-300 | φ300x750 | 15.1 | 1:1.25 | 22 | 3500x1600x1700 |
XK-360 | φ360x900 | 16.25 | 1:1.25 | 30 | 3780x1850x1750 |
XK-400 | φ400x1000 | 18.65 | 1:1.27 | 37 | 4350x1850x1785 |
XK-450 | φ450x1200 | 24.26 | 1:1.27 | 55 | 5200x2380x1840 |
XK-560 | φ560xφ510x1530 | 27.72 | 1:1.2 | 90 | 5845x2284x1978 |
XK-550B | φ550x1500 | 27.94 | 1:1.22 | 110 | 5870x2475x2045 |
XK-610 | φ610x2000 | 28.42 | 1:1.17 | 160 | 7070x2290x1840 |
XK-660 | φ660x2130 | 28.6 | 1:1.24 | 245 | 7465x3662x2080 |
XK-710 | φ710x2200 | 30 | 1:1.09 | 280 | 7500x3500x1800 |
USE:
This two roll rubber mixing mill machine is mainly used in Rubber &
Plastic Product factory for Natural Rubber Mixing(plasticating),
Raw Rubber and Compound mixing, rubber warm-up mixing and pressing
sheet.
Product Description:
This laboratory rubber mixing mill is mainly applicable for plastic, warming and mixing rubber and plastic.
1. This laboratory mixing mill mainly works for thermal refining,
mixing and plastic of raw rubber etc.
2. The roll is made of cold hard cast iron LTG-H.
3. Lab mixing mill can be equipped with infrared, in order to ensure the safety of the operator.
4. We can produce electric heating, steam heating and water cooler rubber mixing mill.
5. The workers can operation the machine in front and back. Lab Mixing Mill is equipped with emergency stop devices which can stop at any time to meet an emergency situation, thus ensure the safety of personnel.
6. Can be equipped with manual and automatic hanging rubber device, easy of tapping and increase staff safety factor.
7. Protective cover can be equipped upward the roller, to ensure the safety of operating personnel.
8. No oil leakage, and pressure steady, small noise.
9. Tailored structure, operate conveniently, and many speeds
available.
Packaging
Equipment painting completed before delivery, and then wrapped with
stretch film, avoid rubbing the paint off the surface, wooden
packaging can be customized, key parts, such as electronic control
box, will be wrapped by shockproof packaging materials, and then
packed in wooden cases.
Our Services
1. Our engineers can design target machines for customers and send
them the drawing to confirm. We are always on the side of saving
your cost.
In the process of production, we will take photos and send to
customers for their track the progress.
2. Documents such as packing list, commercial invoice, and bill of
lading etc. will be sent after the delivery.
3. We could supply free English foundation DWG, installation
drawing, user guide, maintenance manual and part drawing.
4. We supply overseas engineer service and help to train your
workers to operate the machine.
FAQ
1. Delivery time of the rubber machines?
This is specially designed machine according to your specific
requirement.
From engineer designing to production completion, it needs about 25
to 35 days.
2. What does your factory do regarding quality control?
We pay much more importance to quality control from the very
beginning to the end of production.
Every machine will be fully assembled and carefully tested before
shipment.
3. What's the machine quality guarantee?
Quality guarantee time is one year.We choose world famous brand
components to keep our machine in perfect working condition.
4. Are you able to give installation and commissioning overseas?
How long time will it take?
Yes, we can supply overseas service and technical support but
customer needs to pay for the cost of the installation.
Small machine usually takes within 2~3 days.
Big plant usually takes about 30 days.
5. How can I trust you to deliver the right machine as I ordered?
We will absolutely deliver a good quality machine as we discussed
and confirmed in the order.
The core of our company culture is innovation, quality, integrity
and efficiency. Also we have had much good cooperation with world
famous rubber production manufacturers. If you come to our factory,
we can show you're the user around us.
6. How can we go to your side?
We are located in Qingdao City, Shandong province, China. The name
of airport is Qingdao Liuting airport.
We will pick up you at the airport.
![]() |